●Parameters
Rated temperature | 105℃ |
Rated voltage | 300V |
Reference standard | UL62,UL1581,CSA C22.2No.49 |
Type | Parallel SJT style cord |
Material | Copper conductor, PVC insulation |
Flame retardant grade | UL VW-1,CSA FT1 and JQA -F-Mark flame test |
●Product description
Stranded , bare copper conductor 20~14AWG
PVC insulation , comply with ROHS environmental standard
PVC jacket , comply with ROHS environmental standard
Uniform insulation thickness to ensure easy stripping and cutting
For general purpose use for power supply cord
●Detailed data
CONDUCTOR | INSULATION | JACKET | MAX.COND. | |||||
AWG | CONSTR- | DIA. | (No.) | INSULATION | O.D. | JACKET | O.D. | |
20 | 26/0.16 | 0.94 | 2 | 0.78 | 2.50 | 0.80 | 4.10×6.60 | 34.6 |
18 | 41/0.16 | 1.18 | 2 | 0.81 | 2.80 | 0.80 | 4.40×7.20 | 21.8 |
●Application
As a kind of flat cable, it provides power for the system module to ensure the normal operation of the module. It is widely used in digital cameras, instruments, chargers, audio, medical equipment, toys, household appliances and circuit boards.
●Production details
Its processing technology usually includes three steps: PVC granulation, conductor stranding and insulation extrusion. The quality department strictly inspects and controls the feeding, processing and finished products.
●Packing
According to the final diameter values of different AWG sizes, the SPQ of pvc twin flat wire is approximately 1000ft~2000ft/roll.
●Advantages
Mainly used for internal connection, external connection, transmission, etc.
Xinya owns about over 30 invention patents and utility model patents.
●FAQ
Q: Does the wooden pallet meet the export fumigation requirements?
A: In fact, we use a fumigation-free tray and it fully meets the export requirements.
Q: Is there a low peak season for production?
A: Our company's Spring Festival holidays are usually two weeks. The pressure of the production line before and after the Spring Festival holidays will reach its peak, and its production cycle will be prolonged by 1 to 2 weeks than usual. In addition, the logistics and vessel company involved in the export process will be affected by the holidays also. Customers need to consider this factor and place orders in advance.
Q: What is the settlement point of credit payment term?
A: It should be against B/L date. To take "OA 30 days" for example, if the B/L date was 1st of March, the payment maturity date should be accordingly as 1st of April.
←Previous: PVC Flat Ribbon Wire
Next: 20 Pin Ribbon Cable→